Light gauge steel framed structures (LGSF)

  1. Home
  2. Project
  3. Light Gauge Steel Framed (LGSF) Structure
Light Gauge Steel Framed Structure 3

Client’s Requirement

The client required a fast, efficient solution for lightweight structures with flexibility, weather resistance, and low energy consumption. They prioritized reducing construction time while ensuring material strength and quality.

  • Short construction duration
  • Lightweight but strong materials
  • Energy-efficient, green product
  • Flexible design for customization
  • Minimal construction waste, Light Gauge Steel Framed Structures (LGSF)

Business Needs

  • Quick project turnaround time
  • Lightweight, durable construction materials
  • Environment friendly and energy-efficient solution
  • Customizable design for flexibility
  • Minimal waste during construction

Solution

Shilpkar India determined that Light Gauge Steel Framed (LGSF) Structures were the ideal solution to meet the client’s needs. The structural efficiency of the LGSF system allowed for quick construction using lightweight materials. The company’s in-house engineering team designed the structure with a highly versatile concept, utilizing advanced CAD technology. Roll-forming technology enabled precise manufacturing of steel components with minimal waste

Implementation

The implementation process involved

  • Design: A CAD-based design was developed to meet specific structural needs.
  • Fabrication: So Steel components were produced using automated roll-forming machines.
  • Construction: Prefabricated parts were assembled on-site, significantly reducing construction time compared to conventional methods.
  • Sustainability: LGSF provided excellent thermal insulation, reducing energy consumption for heating and cooling, making the building energy-efficient.

Result

These points highlight the successful outcomes of the project, focusing on quick completion, cost efficiency, durability, flexibility, and client satisfaction.

  • Rapid Construction: Completed within 6 months, meeting the client’s timeline.
  • Cost-Effective: Prefabricated steel reduced labor costs and minimized waste, optimizing the budget.
  • High Durability: Structures were highly durable, weather-resistant, and long-lasting.
  • Customizable and Flexible: The design allowed for future modifications and expansion.

Client Feedback

The client praised the timely completion, high quality, and sustainability of the project. They were pleased with Shilpkar India’s solution, which met all business requirements without compromising quality or efficiency.

project gallery

location

India

Material Used

Galvanized Steel, Insulated Panels

Technology Used

LGSF Technology

Service Used

Prefabricated Structures, Light Gauge Steel Framed (LGSF) Structure

Construction Time

4 months

Call Support Center 24/7

+91-85279-94737

Prefabricated Solutions

Contact us

Get in touch with us

    connect with us